ADVERTISEMENT
  • Home
  • News
  • Showbiz
  • Sports
  • World
YawaNews
  • Home
  • News
  • Showbiz
  • Sports
  • World
No Result
View All Result
  • Home
  • News
  • Showbiz
  • Sports
  • World
No Result
View All Result
YawaNews
No Result
View All Result
Home News

Ghanaian lady ‘cries’ over crazy unending Dawhenya traffic

November 22, 2024
in News
Ghanaian lady ‘cries’ over crazy unending Dawhenya traffic
0
SHARES
Share on FacebookShare on Twitter

A video shared by a media personality, Leticia Danso has highlighted the plights and frustrations residents and commuters of the Tema-Aflao road and Dawhenya go through daily before they get to their destinations, highlighting how it is affecting productivity.

ADVERTISEMENT

According to her, the traffic congestion on the road which is caused by a stall in road construction on the Tema-Aflao road has indirectly caused people to lose their jobs and other several negative effects because, the road which connects to Accra within an hour drive now takes over four hours to navigate it. This she explained that, is gradually contributing to low productivity in organizations that the commuters work in.

She added that, when it rains then situation on the road worsens, the vehicular traffic and congestion alone can take about five hours for a journey which is ordinarily not up to an hour. She mentioned how school children are undergoing frustrations and its adverse effect it is having on their studies due to the lateness the traffic causes them.

RelatedPosts

Hajia Alima in hot water over visa scandal – Ablakwa

Revealed – NDC flagship 24-hour economy officially begins on July 2, 2025

Video – Krowor MCE accused of destroying New Life Nungua Children’s Home for a road project

She detailed how the Construction Company after halting their works have left their excavators and other heavy machines on the road. She mentioned that, their joy of having an easy journey after the road construction began has turned sour because of the halt in construction. She called on the authorities to attend to the road in order to save people from frustrations and also to avert the continuous low productivity.

Watch video here

“If you know anyone living on the Community 25 stretch, pray for them! They’re going through hell!” We believe @lorrenciaadam speaks for everyone in the area. We’ve been on the ground this morning, and it’s clear from their faces—they’re fed up!#CitiNewsroom pic.twitter.com/dyR1ouDYY8

— CITI FM 97.3 (@Citi973) November 22, 2024

Tags: DawhenyaTema Community 25
ShareTweetPin
Previous Post

It is unacceptable for Cocobod to prioritize GHC3.4bn expenditure over struggling cocoa farmers – Mahama

Next Post

Watch John Mahama grove to new campaign song by Nacee

Next Post
Mahama will win in the first round - Mussa Dankwah

Watch John Mahama grove to new campaign song by Nacee

Recent Posts

  • Hajia Alima in hot water over visa scandal – Ablakwa
  • Revealed – NDC flagship 24-hour economy officially begins on July 2, 2025
  • Video – Krowor MCE accused of destroying New Life Nungua Children’s Home for a road project
  • Nurses and Midwives threaten to resume strike
  • Hajia Alima Mahama signed a ‘forever’ contract with Fred Kwarteng – Ablakwa

Recent Comments

No comments to show.
  • Email: YawaNewsgh@gmail.com
  • Contact Us
  • About Us
  • Privacy Policy
  • SiteMap
WhatsApp ONLY : +233 20 241 7018

© 2024 YawaNews

No Result
View All Result
  • Home
  • News
  • Showbiz
  • Sports
  • World

© 2024 YawaNews